Buy desk · NVIDIA H100

Buy NVIDIA H100.

Currently unavailable. The listed NVIDIA H100 line has sold through; the figures on this page are for reference. Ask the desk to source it or see what is live.

NVIDIA H100 HGX nodes from $240,000, refurbished, US stock, 7 day lead time. Buyer-side desk: you contract direct. New, refurbished and cancelled orders.

Get a firm quote See live inventoryAcknowledged within one hour, first sourcing pass within one business day.
At a glance

The answer, before the pitch.

Indicative pricefrom $240,000 per 8-GPU HGX node
ConditionRefurbished
Lead time7 days
Stock regionUS
You contractDirectly with the supplier
First responseWithin one hour

H100 is now the value play of the HGX line. Fleet rotation and cancelled orders have put real volume into the market as larger operators move to Blackwell, which is why a verified refurbished node lands well under half of what the same silicon cost eighteen months ago. For inference, fine tuning and mid-scale training it remains a completely serious platform.

Detail on the platform itself is on the NVIDIA H100 page, current quantities on the live inventory, and availability routes on the availability page. What it costs landed, with freight, duties and import handled, is on the import and IOR desk.

NVIDIA H100 HGX node

Watch this market.

One email when pricing or stock moves on NVIDIA H100. No newsletter, no drip, just the desk.

Straight answers

Asked first, answered straight.

How much does an NVIDIA H100 cost in 2026?

Verified refurbished HGX nodes are currently listed from $240,000 per 8-GPU node ex-works US, which is $30,000 per GPU. Price moves with quantity, condition and destination, so treat it as the starting point rather than a fixed tag.

What is the lead time on H100 nodes?

From stock, about 7 days ex-works for listed lines, plus freight and import time to your destination. Larger quantities assembled from fleet rotation can take longer, and we quote that honestly up front.

Should I buy H100 or wait for Blackwell?

If the workload is inference or fine tuning, H100 at current pricing is often the stronger economic answer. If it is frontier-scale training, the calculus changes. We run both numbers with you before you commit either way.

How this desk works

Buyer-side, end to end.

SSP is a buyer-side GPU procurement desk. We pressure-test price, lead time, terms and exit before you sign, and you contract directly with the supplier. Requirements are qualified and KYC runs before any introduction, which is why suppliers quote real numbers. You see the shortlist and the reasoning, and the engagement ends when the hardware runs, not at the signature.

Talk to the desk

Working through this on a real requirement?

Tell us the platform, quantity and destination, and the desk comes back with a first sourcing pass within one business day.

Acknowledged within one hour, first sourcing pass within one business day.

Sent. We are on it.

Your enquiry has landed with the desk. Acknowledged within one hour.