Blackwell Ultra · 288GB HBM3e · SXM (HGX B300)

Buy NVIDIA B300 GPUs.

Verified allocation through the authorised channel, indicative direct pricing, landed anywhere the compliance file clears. You transact on the supplier's direct terms; our compensation sits on the supply side.

Check availability Find your fitAcknowledged within one hour, first sourcing pass within one business day.
The desk view

Where the NVIDIA B300 fits.

The B300 is the current flagship of the NVIDIA line: Blackwell Ultra with 288GB of HBM3e per GPU, built for frontier training and the heaviest inference. It is also the SKU where allocation discipline matters most, because demand exceeds supply everywhere and the channel noise is loudest.

We hold verified access to volume: 256 new HGX nodes in the US on an 18 week lead is a real position, and it exists because the compliance file behind it is clean. This is also the platform our flagship leasing structure is built on.

NVIDIA B300
Availability

What is verified today.

In the channel now256 HGX nodes new, US located
Indicative price$585,000 new per 8-GPU node
Lead time18 weeks

Every line verified with the holder. Full list on the live inventory; pricing is indicative, ex-works USD, and moves with volume and term.

Straight answers

Asked first, answered straight.

Is the B300 overkill for my workload?

Possibly, and we will say so. Plenty of production inference runs beautifully on H200 or H100 nodes at a fraction of the cost. The B300 earns its price on frontier-scale training and the largest models; buying it for lighter work is the most expensive mistake in the market.

What does a B300 node need from the facility?

Blackwell Ultra densities push past what most legacy halls cool. Liquid-capable floors and serious power per rack are the gating questions, and we qualify the facility before the hardware conversation finishes.

Buy or lease B300 capacity?

Both structures exist here. Owning suits long, funded roadmaps; the leasing desk puts B300-class nodes in a named Tier III facility in roughly 8 to 10 weeks with a 20% deposit. The comparison page walks the decision.

Talk to the desk

Working through this on a real requirement?

Twenty minutes with the desk, no pitch and no quote at the end of it. Tell us roughly what you need and we will come back within one business day.

Acknowledged within one hour, first sourcing pass within one business day.

Sent. We are on it.

Your enquiry has landed with the desk. Acknowledged within one hour.