Buy desk · NVIDIA GB300 NVL72

Buy NVIDIA GB300 NVL72.

GB300 NVL2 racks at $5.5M per rack, 50 racks new in the US, 18 week lead. Liquid-cooled 72-GPU racks through OEM channel allocation. You contract direct.

Get a firm quote See live inventoryAcknowledged within one hour, first sourcing pass within one business day.
At a glance

The answer, before the pitch.

Indicative price$5,500,000 per NVL2 rack
ConditionNew
Lead time18 weeks
Stock regionUS
You contractDirectly with the supplier
First responseWithin one hour

GB300 NVL72 is sold as a rack, not a card: 72 GPUs, 120 kW or more per rack, liquid cooling mandatory. Buying it is as much a facility decision as a hardware one, which is why the desk runs the power and cooling questions alongside the allocation itself. Current listed position is 50 new GB300 NVL2 racks in the US. The earlier Supermicro L11 build has sold through.

Detail on the platform itself is on the NVIDIA GB300 NVL72 page, current quantities on the live inventory, and availability routes on the availability page. What it costs landed, with freight, duties and import handled, is on the import and IOR desk.

NVIDIA GB300 NVL72 rack build

Watch this market.

One email when pricing or stock moves on GB300 NVL72. No newsletter, no drip, just the desk.

Straight answers

Asked first, answered straight.

How much does a GB300 NVL72 cost?

The listed line runs $5.5M per NVL2 rack, 50 racks available. The earlier L11 build ran $5.9M for 10 fully racked nodes with wiring and network hardware, ex-works US. Per-rack economics depend on the build state and how much integration work is already done.

Can my data centre host GB300 racks?

Only if it can deliver and cool 120 kW or more per rack with direct liquid cooling. Most halls cannot, and settling that question first saves months. We source facility capacity alongside the hardware when needed.

What is the GB300 lead time?

About 18 weeks for the listed racks. New channel allocation runs longer and depends on the OEM queue, which we verify per requirement rather than quoting a brochure number.

How this desk works

Buyer-side, end to end.

SSP is a buyer-side GPU procurement desk. We pressure-test price, lead time, terms and exit before you sign, and you contract directly with the supplier. Requirements are qualified and KYC runs before any introduction, which is why suppliers quote real numbers. You see the shortlist and the reasoning, and the engagement ends when the hardware runs, not at the signature.

Talk to the desk

Working through this on a real requirement?

Tell us the platform, quantity and destination, and the desk comes back with a first sourcing pass within one business day.

Acknowledged within one hour, first sourcing pass within one business day.

Sent. We are on it.

Your enquiry has landed with the desk. Acknowledged within one hour.